All projects
Fixture installs
Bathroom refit in Oak Hills
New shower valve, vanity and toilet fitted in a 1970s bathroom.
Area
Oak Hills
Duration
3 days
Completed
Drag the handle to compare before and after.
The problem
The shower valve had been dripping for months and the original 1970s vanity was pulling away from the wall. The owners wanted it sorted before family came to stay for the holidays.
What we did
We replaced the shower valve and trim, fitted a new double vanity with two faucets, and swapped the old toilet for a low-flow model. Soft subfloor behind the toilet added half a day.
The result
Finished in three days on the price we quoted. “It looks like a different room, and they cleaned up every evening,” said Linda.
Want the same result?
Tell us about your job and we’ll give you a fixed price before we start.

